Client TGP CAMPAMENTO KITENI
Location CUSCO – Perú
Date 2012
Flow 36 m3/día
Load 10.8 Kg/ día de DBO

Domestic Wastewater Plant, Kiteni Camp

The design of the domestic wastewater treatment plant for 180 people that consists of an aerobic biological treatment by Activated Sludge with conventional aeration, followed by a disinfection process. For the sludge line, a digestion and thickening stage is considered.

The scope of this project covers engineering development, equipment supply, assembly and commissioning.

Back to list

Projects