
Client Poderosa Mining
Location La Libertad – Perú
Date in process
Flow 500 m3/day
Load 150 Kg/day of DBO
Solution Residual water treatment plant
Domestic wastewater plant, Santa María camp
Biological treatment system using MBBR technology.
The process stages defined in the project are: equalization and discharge of water, MBBR biological treatment, sedimentation and disinfection; in addition to the sludge treatment that consists of thickening, and dehydration through a press filter system.
The scope of this project covers the development of detailed engineering and supply of equipment.